Step 16 :
Plug the enclosure power cords into a PSU to power the enclosure.
Step 17 :
Double check the power indicators and other LEDs to ensure that the
system is booting.
Result: The enclosure is now installed.
CAUTION
T
o ensure proper airflow for enclosure cooling, all drive
slots must be populated with either drives or drive
blanks.
Step 14:
Now that the drives are installed into the chassis, test the installation by
sliding the enclosure in and out of the rack a minimum of three times. If the enclosure
binds, catches, or displays any incorrect motion or behavior retry the installation of
the drives and chassis.
Step 15 :
If the chassis is being installed into a rack that will be shipped fully
assembled, you must install eight (four per side) of the included Flat Head Torx
screws into the two brackets at the front of the chassis in the following locations.
These screws should be tightened to 3.38-3.61 Nm / 30-32 in-lbf using a Long T15
Torx Screwdriver. If this chassis will not be installed into a rack for shipping purposes,
skip this step and move on to the next one.
23
Promise Technology
VTrak J5960 Quick Start Guide