1.
Remove the cable insulation according to Fig. 16 and crimp on the
corresponding cable end sleeves.
2.
Connect the cables according to the wiring diagram.
3.
Check all of the cabling using the wiring diagram.
4.
Tighten the clamping screws of the cable glands until they are leak-
tight.
–
To install the leads for terminals XE1 to XA1 simply
insert the leads into the terminals.
–
To release the leads for terminals XK1 to X2 again,
simply press on the white button of the required terminal
using the tip of a ball-point pen and pull the lead out.
–
The wiring diagram is contained in the appendix.
7
30
P_DC_0005_SW
Fig. 16: Removing the wiring insulation
Electrical connections of an external pre-storage module
30
32
31
P_PMA_BEZ_0120_SW
33
Fig. 17: Plan view of the external pre-storage module
30 Level switch "empty" (NO); connect to ClO
2
pump or PLC
31 Level switch "min." (NO); connect to XK3:3/4
32 Level switch "full" (NC); connect to XK8:1/2
33 Level switch "overflow" (NC); connect to XK3:1/2
Installation
31