
Personnel:
n
Electrician
1.
Check whether the mains voltage is switched off!
2.
Possibly: Connect a fault signalling alarm.
3.
A remote demand can be connected to the metering pump
for metering the diluted ammonia solution into your process -
refer to “Operating instructions for solenoid metering pump
Beta b, BT4b and BT5b" and wiring diagram
"82_05-401_00_05-44".
4.
Connect a mains cable from the switch cabinet (terminal strip
X0) to the mains voltage.
1
2
P_HYD_0029_SW
Fig. 5: Switch cabinet control elements(on the side of the system)
1 Main switch with Emergency Stop function
2 “Start filling metering vessel” key
Installation
22
Содержание DULCODOS Ammonia
Страница 51: ...51...