![Prolitec Air-Q 1100 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/prolitec/air-q-1100/air-q-1100_user-manual_1615442011.webp)
Air-Q 1100 User Guide
Page
9
of
18
(rev 1.0 5/13/09)
© Copyright 2009 Prolitec Inc
VI.
Installation
A.
Pre
‐
installation
Checklist
This
checklist
should
be
completed
before
the
install
date.
1.
Confirm
the
area
to
be
targeted
for
air
treatment
2.
Determine
the
Air
Handling
Unit
or
duct
that
serves
the
target
area.
3.
Make
sure
the
AHU
does
not
use
an
open
gas
flame.
4.
Find
and
mark
the
optimal
insertion
point
for
the
Injector
Tube.
(See
section
C:
“
Appliance
Positioning
”)
5.
Find
and
mark
the
exact
location
for
placement
of
the
appliance
(See
section
C:
“
Appliance
Positioning
”)
6.
Note
the
distance
between
the
insertion
point
and
the
proposed
appliance
location.
(NEVER
MORE
THAN
6
FEET)
and
there
should
NEVER
be
a
LOW
POINT
in
the
hose
run.
7.
Determine
and
mark
the
location
for
the
110
or
220V
AC
power
outlet.
(NEVER
DIRECTLY
BELOW
THE
appliance)
B.
Installation
Kit
(photos
–
Page
10)
•
One
(1)
Air
‐
Q
1100
appliance
(not
pictured)
•
One
(1)
Prolitec
Injector
Tube
(a)
•
Three
(3)
Feet
3/8
th
ID,
½
OD
Injector
hose
(b)
•
One
(1)
hose
connector
assembly
(c)
•
One
(1)
hose
clamp
(d)
•
Seven
(7)
#10
self
‐
tapping
sheet
metal
screws
for
securing
the
appliance
and
injector
tube
on
sheet
metal.
(e)
•
1
spare
set
of
3
o
‐
rings
for
the
air
the
nozzle
(f)