background image

 

Montageanleitung / 

Installation manual

 

MBN GmbH, Balthasar-Schaller-Str. 3, 86316 Friedberg - Germany  

www.proled.com 

Installation:  

 
1. Mark position on Wall 

 

 

2. Drill holes for dowel   

3. Place dowel in line 

 

 

 

 

 
 
4. Fix luminiare holder on wall and pull    

 

 

5. Detach luminaire and lay beside 

    power line through rubber grommet 
 

 

 

 

 
 
6. Connect power line to junction box 

  

 

 

7. Connect luminiare and fix to holder 

 

 

 

 

 

 
 
 

Choosing of power and colour temperature:  

 
DIP-switch 1 + 2: 

Power choose   

 

       DIP-switch 3 + 4:  CCT choose 

  

 

 

(Default 20 W)   

 

 

 

 

Default 3000K 

 
      10W 

          15 W 

 

20 W 

 

 

3000K   

   4000K 

     5000K 

 

 
 
 
 
 

07.19 Technical amendments reserved 

Отзывы: