background image

Roof Section Stages

25mm Metal

Roof Screws

Front

Position and fix the
Monopitch Ridge Flashing
to the front of roof sections.
These are the same lenghts
of water deflector flashing

Monopitch Ridge Flashing Stages

ID: 21181

Back

Side

Side

Front

Barge Board Flashing Stages

UPVC Single Door Glazing Unit fixing

Gently position and
fit the door glazing
unit to the uPVC
door frame

ID: 25327

UPVC Single Door Glazing Unit fixing

UPVC Door

frame

Door

Glazing Unit

Position and sit the glazing unit to the bottom
rubber strip. Gently fit the glazing unit to
the door frame.

ID: 25327

Rubber
fitting strip

UPVC Single Door Glazing Unit fixing

Position the rubber
strip to the bottom
of the door frame

67

69

70

71

68

Содержание My Den Metal Roof

Страница 1: ...e read the instruction carefully and retain for future reference For Queries and Help please contact 01777 802300 Please note that all images are for illustration purpose only V1 4 20 04 22 INS0138 10...

Страница 2: ...1217mm 2 Metal Roof position 610mm 505mm 1000mm 585mm 1220mm 1220mm Back Panels position Front Panels position 610mm Single Door Panel 610mm 610mm 1220mm 1220mm 585mm LOW 585mm LOW 1220mm HIGH 585mm 6...

Страница 3: ...ottom Panel Top Panel Bottom Panel IMPORTANT Always check the internal lining corner gap of the panels 2135mm 1220mm Side Window Opening Panel LEFT Diagram ID PT25521 Side Opening Window LEFT position...

Страница 4: ...of Section 505mm Width Roof Section 610mm Width Roof Section 1000mm Width Rear Frame Standoff Gable Frame Standoff CENTRE Back Panel 585mm WIDTH 10ft Front Monopitch Ridge Flashing 10ft Back Water Def...

Страница 5: ...93mm 1 3 Gable Bearers 38mm x 1817mm 2 Parts List required ID PT25393 ID PT25394 ID PT25397 Base Module fixing Side Front Module I x2 Module J x1 1220mm 1220mm 585mm I I J 1 Side 1220mm Module Pilot d...

Страница 6: ...oles before fixing Base Module fixing 70mm Screws Side Front Back Alternate sides to screw together Pilot drill holes before fixing Base Module fixing 70mm Screws Side Front Back Ensure the ground mus...

Страница 7: ...the top of assembled base module Floor Stages Base Module fixing Side Front Fix and secure the plinth and base module together Side Front Back Floor Stages Pilot drill holes before fixing 70mm Screws...

Страница 8: ...1 4 Gable Cloaking Strip 1 60mmx16mmx2050mm Parts List required 16mm 2135mm 74mm 1146mm 1220mm Lining Flush 16mm 2135mm 1220mm Lining Flush Door Panel Diagram Left Gable Panel HIGH Diagram ID PT20329...

Страница 9: ...and fix the door section to the left gable panel high and plinth Left Gable and Door Panel LEFT Position Front Back Lining Flush Lining Flush Left Gable High Panel Stages Front Side LEFT Align and fi...

Страница 10: ...together Position and fix the gable cloaking strip LEFT Gable Cloaking Strip CS ID PT21075 Front Side LEFT Position and fit the UPVC Door section to the door panel LEFT UPVC Door fixing ID 19503 50mm...

Страница 11: ...ning Flush LEFT Back Panel 1220mm Diagram RIGHT Back Panel 1220mm Diagram CENTRE Back Panel 585mm Diagram ID PT25541 ID PT25543 ID PT25542 74mm 1220mm Back Panel LEFT 1220mm Back Panel Right 585mm Bac...

Страница 12: ...x2050mm Parts List required 16mm 2094mm 585mm Lining Flush 16mm 2135mm 1220mm Lining Flush Right Window Panel HIGH Diagram Right Gable Panel LOW Diagram ID PT25532 ID PT25522 50mm Screws Back Pilot dr...

Страница 13: ...47 Parts List required 50mm Screws Back Side RIGHT Position and fix the side Plain Gable Panel right Pilot drill holes before fixing Right Gable Low Panel Stages ID PT25532 35 50mm Screws Side RIGHT P...

Страница 14: ...panels Check the corner gap of panel Bottom Panel Stages Check the Door Panel and Front Window Panels position options LEFT or RIGHT ID PT25547 70mm Screws Front S70 S70 S70 S70 Align and fix the seco...

Страница 15: ...ws Front Pilot drill holes before fixing Glazing Unit fixing Glazing Unit fixing S70 S70 S70 S70 ID PT18490 FRONT Corner Trims CT 60mm x 16mm x 2135mm Corner Trim 80mm Screws Front Side Front Side ID...

Страница 16: ...m x 2050mm 2 Side Back Side Front Pilot drill holes before fixing GABLE Roof Stand Off Frame SOF ID PT21075 Panel Pins 40mm x 11mm x 1740mm 2 Window Frame Cloaking Strip CS ID PT21075 Side Back Drip E...

Страница 17: ...gram Screws must fix throught the top ridge Position the 610mm width of roof section and ensure to fit underneath to the wall panels Secure with metal screws Use Step ladder when fixing the roof secti...

Страница 18: ...rts List required 1m Wide 505mm Wide 1m Wide Metal Roof Wall Panels 115mm Metal Roof Screw Ensure the 115mm metal roof screws fix through to the wall panels Metal Roof Cross Section Diagram 58 Roof Se...

Страница 19: ...Position the 1m wide roof section and slot it into the first roof section Fix in place with metal roof screws 115mm Metal Roof Screws ID 21150 Water Deflector Flashing Length Size Building size 10x6 L...

Страница 20: ...rd Flashing Stages UPVC Single Door Glazing Unit fixing Gently position and fit the door glazing unit to the uPVC door frame ID 25327 UPVC Single Door Glazing Unit fixing UPVC Door frame Door Glazing...

Страница 21: ...D 19655 UPVC Door Frame and UPVC Beading UPVC Beading UPVC Beading Door Glazing UPVC Door Frame Front Back UPVC Single Door Glazing Unit fixing Position the side UPVC beading to both sides of door fra...

Страница 22: ...ilicone sealant around the edges where the window frames meet the timber framing Silicone Sealant optional Internal Cover Trims Fit the top architrave over the battens on the window frame Secure the a...

Страница 23: ...rave using panel pins See side window architrave detail ID 21081 Internal Cover Trims Fit the architraves around the opening window frame Secure the architraves using panel pins ID 21081 Internal Cove...

Страница 24: ...k wall top battons to the back panels and secure with 50mm screws Back Wall Top Batton 23mm x 28mm x 1468mm 2 Pilot drill holes before fixing ID 21081 25mm Black Screws Back Position and fix in place...

Отзывы: