background image

!

!

WARNING

A hammer or mallet may be needed during assembly.

Figure1

Figure 3

Figure 4

Figure2

U6

U4

U3

U4

assembled

U1

U2

A

U3

Playing
Court

Front side

Back
side

Place the Pole on the Anchor system.

Slide one Thick washer M16 (U3) over
each J-bolt (U2). Lift the Pole (A) onto
Anchor system, secure with one thick
washer (U3), one Lock washer M16 (U6)
and one Hex nut (U4) for each J-bolt.
See

Figure 1

.

If the Main Post (A) is not exactly
vertical, adjust the 16mm J-Bolt Hex
Nuts (U4) located under the Post base
(A). Tighten all of the Hex Nuts (U4)
Above Post base when Main Post (A) is
vertical.

NOTE: Face the Main Post (A) with Actuator
Bracket facing away from playing court (as
shown in

).

FIGURE 2

1.

Attach Lower Extension arm (E) to
Pole (A),

Figure 3

as shown in

.

Secure it with one Hex bolt M12x270
(#1), two Flat washers M12 (#7),four
Plastic Washers M12 (#8), one Lock
nut M12

6

See

(# ).

Figure 7.

Note

make sure Plastic washers go

:

between Lower Extension and Pole

.

2.

A

Slide Plastic sleeve
over Actuator

5

1

7

8

8

E

6

7

8

1

8

8

8

7

7

6

J

5

5

7

7

7

8

8

3

D

8 8

6

Отзывы: