
Production Basics, Inc. Massachusetts, USA 800.318.2770 617.926.8100 Fax: 617.926.8010 www.pbasics.com
A S S E M B L Y M A N U A L
ASSEMBLY VIDEOS AVAILABLE ON-LINE http://video.pbasics.com
P A R T S A N D H A R D W A R E
Q U A N T I T Y
30”D
worksurface
36” D
worksurface
Height Adjustable C-Legs (2 pieces each)
2
2
Frame
1
1
Worksurface Support Rails
2
3
Top Brackets
2
2
Worksurface
1
1
Leveling Feet
6
6
End Caps
8
8
Wood Screws
8
12
Tek Screws
6
8
Basic Nuts
8
10
Basic Bolts
12
14
7/32 Allen Wrench
1
1
Casters (if ordered)
4
4
Other Items Needed (not included)
Phillips head screwdriver or drill
Rubber Mallet
Level
C-LEG STATIONS
Item Numbers 1000-1711
Workstations
Assembly Tips
•
Review entire instruction manual before proceeding.
•
Assembly How-to Videos available on-line
http://video.pbasics.com
•
Production Basics name plate indicates front of frame.
•
Basic Nut grooves must grip inside of frame channel for
support (see below).
•
When initially securing Basic Bolts to Basic Nuts, attachment
is easy when nut and bolt are turned only one revolution.
•
Legs are adjustable in 2-inch increments between 30-36
OR 36-42 inches high to customize worksurface height,
depending on products ordered.
•
Don’t be a slave to gravity–recruit a co-worker to help you
install and correctly position components and accessories.
•
References to ‘Left’ and ‘Right’ are oriented as if you were
facing the front of the workstation.
Basic Bolt
Basic Nut
Wood Screw
Tek Screw
C-Leg Stationwith optional accessories
1602A101
1