
2-7
Installing the Switch
Installation Procedures
2.
Check the LEDs on the switch. The LED behavior is described
below.
When the switch is powered on, it performs its diagnostic self
test. The self test takes approximately 8 seconds to complete.
Self Test LED Behavior:
During the self test:
•
The LEDs will go on for a couple of seconds during the phases
of the self test.
When the self test completes successfully:
•
The
Power
LED stays on.
•
The
Fault
LED stays off.
•
In the default state, the
FDx
LED stays on and the
Spd
LED
stays off.
•
The port LEDs on the front of the switch go into their normal
operational mode.
–
If the ports are connected to active network devices the
Link LEDs should be on.
If the LED display is different than what is described above, the
self test has not completed correctly. Refer to chapter 4,
“Troubleshooting” for diagnostic help.
Port LEDs
Power LED
Содержание 1810-8G
Страница 1: ...Installation and Getting Started Guide www procurve com ProCurve Switch 1800 8G ...
Страница 2: ......
Страница 3: ...ProCurve Switch 1800 8G Installation and Getting Started Guide ...
Страница 20: ......
Страница 24: ......
Страница 43: ...B 11 Safety and EMC Regulatory Statements Safety Information Safety Information Japan ...
Страница 44: ...B 12 Safety and EMC Regulatory Statements Safety Information Safety Information China ...
Страница 46: ...B 14 Safety and EMC Regulatory Statements EMC Regulatory Statements Japan VCCI Class A Korea Taiwan ...
Страница 61: ......