6
9. Remove the ties from the main tower.
10. Use a knife to cut the tape that
secures the foam packaging for the
secondary tower to the box.
11. Carefully lift the secondary tower and
its packaging from the box.
12. Use side cutters to cut the ties
that secure the secondary tower and
accessories to the packaging. Make sure
to support the tower so it doesn't drop
and become damaged once the ties have
been cut.
13. Cut the remaining ties to release
the helicopter and cover from the
foam packaging.
Содержание Arleigh Burke Class Destroyer
Страница 12: ...12 7 Accessory item G and location 8 Accessory item H and location ...
Страница 13: ...13 9 Accessory item I and location 10 Accessory item J and location ...
Страница 14: ...14 11 Accessory item K and location 12 Accessory item L and location 13 Accessory item M and location ...
Страница 15: ...15 14 Accessory item N and location 15 Two of the N items will be placed on accessory R as shown ...
Страница 16: ...16 16 Accessory item O and location 17 Accessory item P Q and R and locations ...