CD -2 1 2 P
PRO WEL D
9.3 Cuphead and Power Point pin hook-up (see Figure 4)
A. Connect ground cable connector (1A) into camlok (1). The camlok should be connected into the
receptacle marked CUPHEAD. Twist until it locks. Attach “C” clamp (2) to the workpiece (5)
(CLEANED AREA).
B. Connect the gun control cable (3A) into the female receptacle (3).
C. Connect the gun weld cable (4A) into the receptacle marked GUN (4). Twist clockwise until it
locks.
D. Connect AC power cable to AC outlet.
NOTE:
The gun welding and control cables must be laid out in a straight line. Poor weld quality may result if
welding cables are coiled.
Figure 4 Cuphead Pin Hook-Up
3
3A
1
4
4A
1A
5
2
PAGE 6
Содержание CD-212P
Страница 1: ...OPERATION MAINTENANCE MANUAL...
Страница 2: ......
Страница 5: ...CD 212P PRO WELD...
Страница 6: ...CD 212P PRO WELD...
Страница 7: ...CD 212P PRO WELD...
Страница 8: ...CD 212P PRO WELD...
Страница 19: ...CD 212P PRO WELD PAGE INTENTIONALLY LEFT BLANK...
Страница 20: ...CD 212P PRO WELD Figure 10 Light Duty CD Gun PAGE 11...
Страница 31: ......
Страница 32: ...WELD PRO MANUFACTURED BY MADE IN THE U S A...