WWW.PROCUTUSA.COM
PG /
Ø77
A .8” calibration
block is required
to perform this
procedure.
ATTENTION
CALIBRATION GUIDE
Motor must be off but unit plugged in.
Computer must be on.
Install fresh unused cutting tips on the cutting arms.
Select “i” on screen.
Select “Calibrate lathe.”
Properly place the 0.800" / 20.32mm calibration block between the cutting
tips as shown on screen.
Select “Okay.”
Confirm or press “Yes.”
Select “Home.”
Remove the calibration block from the cutting arms/tips.
Adjust cutting arms out 10 thousandths per arm.
Reposition the 0.800" / 20.32mm calibration block between the tips and turn
the cutting arms until tips contact the block.
The correct thickness (0.800" / 20.32mm) should register on the screen.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
-
If YES, remove block, clean it and safely store it away.
-
If NO, repeat the procedure. Be sure to use the proper orientation
of the block when measuring the cutting tip distance.
For Tech Support, call 800.543.6618. Press #2 for service.
*Note: There is one pair of faces on the gage block which is NOT 0.800".
Be very careful to not use this pair when calibrating the cutting head.
Содержание PFM 9.2 DRO
Страница 1: ...TECHNICAL MANUAL...
Страница 2: ......
Страница 3: ...TECHNICAL MANUAL P 800 543 6618 F 603 298 8404 info procutusa com www procutusa com...
Страница 12: ...PG 12 800 543 6618 Lathe Overview 1 2 5 3 13 12 9 8 15 10 11 7 14 4 Guard 50 1730 Not Shown 16 6...
Страница 40: ...PG 40 800 543 6618 G2X TECHNICAL SUPPLEMENT 50 1730 GUARD NOT SHOWN...
Страница 42: ...PG 42 800 543 6618 G2X Overview 1 4 7 5 8 6 2 3...
Страница 54: ...PG 54 800 543 6618 50 1740 GUARD NOT SHOWN GYR TECHNICAL SUPPLEMENT...
Страница 57: ...WWW PROCUTUSA COM PG 57 1 3 4 2...
Страница 66: ...PG 66 800 543 6618 14d Press OK to accept these results...
Страница 68: ...PG 68 800 543 6618...
Страница 93: ...WWW PROCUTUSA COM PG 93 NOTES...
Страница 94: ...PG 88 800 543 6618 MAINTENANCE SCHEDULE DATE DRO READINGS HOURS TOTAL AVERAGE LAST 5 MONTH DAY YEAR NOTES...
Страница 95: ...WWW PROCUTUSA COM PG 95 MAINTENANCE SCHEDULE DATE DRO READINGS HOURS TOTAL AVERAGE LAST 5 MONTH DAY YEAR NOTES...