Deep Clean DCFT Conveyor Belt
(continued)
527-502revF_EN 01/2014
©McDonald’s Corporation · Planned Maintenance Manual
Page
3
of
3
6
Reinstall release sheet.
NOTE: Make sure release
sheet is completely dry
before installing.
NOTE: When installing
release sheet, you may flip
inside-out and use the other
side if needed.
7
Turn the toaster ON.
Allow
the toaster to warm up. The
toaster is now ready to
resume use.