Primrose Drop Arm Awning Скачать руководство пользователя страница 2

Height of awning:

The recommended height from the ground is 2.5m-3.5m. If you want to install lower than this, determine
whether there is sufficient headroom when the awning is fully extended and that any doors, windows can
open.

Required headroom:

- Allow 20cm above any door/window frame and check that when opened the door will not interfere with the
awning.

Horizontal positioning of brackets:

Using laser, spirit level or other method, mark an accurate horizontal line at the required height.

Fixing must be directly into brick or concrete. Mortar joints between the bricks or blocks will NOT
be secure enough to bolt into.

Installing onto wooden houses and chalets:

You can install 1.5m -3.0m drop arm awnings onto wooden walls and chalets providing that the wall has
adequate strength to support the weight of the awning. Always ensure that the wall brackets are securely
fitted onto the outside of strong wooden wall studs.

The wall bolts provided in the fitting kit will not be suitable for securing to wooden studs; therefore you will
need to purchase 

Coach Bolts 

of sufficient length and diameter from your local hardware store to replace

the wall bolts (expansion bolts) provided. If unsure, consult a qualified structural engineer for expert advice.

Primrose Awnings Installation Instructions

2

Step 1: Determine position on the wall and mark up

Front view

w

Distance between brackets = W - (100 ~ 200)

Distance between support arms = W - (150 ~ 250)

Содержание Drop Arm Awning

Страница 1: ...line 0870 499 0220 www primrose awnings co uk The expansion bolts supplied are for reinforced concrete or brick walls The awnings may be installed on wooden walls if the wall is sufficiently strong Us...

Страница 2: ...to Installing onto wooden houses and chalets You can install 1 5m 3 0m drop arm awnings onto wooden walls and chalets providing that the wall has adequate strength to support the weight of the awning...

Страница 3: ...exaclty horizonatally level to ensure the awning opens properly and there is no strain on the arms The distance between the two pairs of holes is flexible and will depend on the size of the awning yo...

Страница 4: ...top nut boards on the awning to the ends and fasten the smaller wall bracket linkers Lift both ends of the awning up and hook from underneath onto the wall bracket Screw the two together making sure...

Страница 5: ...rain on the metal If the drilled hole is significantly wider than the expansion bolt you will need to use our R KEM resin kit to secure them Hook the top hole of the arm onto the top protruding expans...

Страница 6: ...der handle to slowly open the awning Check that all the fixings are secure before operating fully With the manual awnings you can control the position of the awning by simply winding out as far you wa...

Страница 7: ...many years of service Stains and bird droppings etc can easily be washed or sponged away and should not be left for prolonged periods The awning should always be retracted in severe weather conditions...