background image

 

 

 

3

 

Step

 

7

 

                    

Faceplate

 

Install

 

(8

 

screws)

 

 

 

Tighten

 

screw

 

1

 

to

 

80%,

 

next

 

Tighten

 

screw

 

2

 

to

 

80%,

 

next

 

Tighten

 

screw

 

3

 

to

 

80%,

 

and

 

next

 

Tighten

 

screw

 

4

 

to

 

80%.

 

Once

 

all

 

screws

 

are

 

80%,

 

start

 

process

 

over

 

till

 

screws

 

are

 

100%.

 

  

NOTE:

  

DO

 

NOT

 

OVERTIGHTEN.

 

This

 

reservoir

 

does

 

not

 

require

 

a

 

large

 

amount

 

of

 

torque

 

to

 

work

 

properly,

 

so

 

do

 

not

 

wrench

 

down

 

on

 

the

 

screws

 

or

 

the

 

acrylic

 

will

 

crack

 

and

 

leak.

 

 

Once

 

the

 

central

 

frame

 

is

 

properly

 

fitted

 

to

 

the

 

pump

 

housing,

 

remove

 

the

 

rest

 

of

 

the

 

protective

 

paper

 

off

 

the

 

acrylic

 

face

 

plate

 

and

 

lay

 

gently

 

on

 

the

 

frame.

  

Make

 

sure

 

the

 

O

ring

 

is

 

still

 

in

 

the

 

channel

 

and

 

not

 

protruding

 

out

 

ANYWHERE.

 

 

Once

 

the

 

face

 

plate

 

is

 

in

 

place,

 

locate

 

the

 

2x

 

four

 

packs

 

of

 

6

32

 

screws

 

in

 

the

 

bag

 

WITH

 

the

 

plastic

 

caps.

 

(See

 

picture

 

to

 

the

 

left).

 

 

Gently

 

place

 

the

 

screws

 

into

 

the

 

holes.

  

Gently

 

tighten

 

the

 

screws

 

in

 

the

 

order

 

shown

 

in

 

the

 

picture

 

to

 

80%,

 

then

 

repeat

 

to

 

100%.

 

100%

 

should

 

be

 

the

 

equivalent

 

to

 

hand

 

tight

 

tension.

 

DO

 

NOT

 

OVERTIGHTEN.

 

 
 

 

 

Содержание Myriad

Страница 1: ...stick again but will protect the acrylic from getting scratched while you move onto the next step Set this piece aside and proceed to Step 5 Myriad Reservoir System Congratulations on purchasing the m...

Страница 2: ...rame down on your flat surface and start the O ring in one corner of the frame Begin feeding it and pressing it into the groove of the frame Take your time if you go too fast the O Ring WILL pop out A...

Страница 3: ...and leak Once the central frame is properly fitted to the pump housing remove the rest of the protective paper off the acrylic face plate and lay gently on the frame Make sure the O ring is still in t...

Страница 4: ...perly Insert the screws into the holes and begin to tighten Follow the same tightening process as you did previously Tightening these screws to hand tight tension just like the center screws is adequa...

Страница 5: ...rneath it and tighten screws into plate Tighten the screws all the way down and then untighten approximately turn or until the plate slides back and forth Repeat for other bracket There are 8 screws p...

Страница 6: ...installed cap will be perfectly horizontal with the pump and housing If the cap is crooked it will leak Unscrew the cap and repeat until the cap is installed properly Fill and Test As with any water c...

Страница 7: ...VD drive that is twice as tall Insert the reservoir so its flush with the case and tighten the screws on the bracket plates You may need to remove the reservoir and repeat this process a couple times...

Отзывы: