Primetime PTC13 Скачать руководство пользователя страница 2

Snap the plastic cover (D) in place over the ceiling plate (C).

Use a stud sensor to locate the framing member (joist) near the desired 

mounting position for the ceiling mount. Using a sharp device (ie. drill bit or 

ice pick), penetrate the ceiling to identify the true center of the joist. The ceiling 

plate (C) will cover the holes that are made. 
NOTE: The joist members are typically 1-1/2” wide and spaced 16” on center apart. 
Some joist spacing may be 24” rather than 16” on center.

Use the ceiling plate (C) as a template to mark four holes.  Make sure to align the 
ceiling plate, so that the lag screw mounting holes lie in the center of the joist. 
Once the holes have been marked, drill four holes, 2-1/4” deep using a 5/32” drill 
bit. Slide an indexing washer (B) onto a platform bolt (A) and drop the platform bolt 
and indexing washer assembly through the center hole of the top (concave side) 
of the ceiling plate (C). Using the lag screws (J), mount the ceiling plate (C) to the 
ceiling. It is important that all four lag screws (J) are used and tightened down. This 
will prevent the heads of the lag screws from sticking out, interfering with the plas-
tic cover and will insure the maximum holding strength of the unit.

Δ

 Caution:  Drilling oversized holes may cause the lag screws (L) to pullout 

and undersized holes may cause breakage of lag screws (L) during installation.

Attach the steel frame to the ceiling plate by slipping the plate bolt (A) through the 
upper hole in the frame(G). Slide an indexing washer (B) onto the end of the “D” 
shaped bolt , then secure the steel frame in place by screwing a flange nut (H) snugly 
onto the “D” shaped bolt (A). Tighten the flange nut to desired swivel resistance. 
When unit is secure, insert dome cap (I) onto the bottom of the circular end of the 
steel frame (G) as shown in the illustration to the left.

Δ

 Note:  If a VCR bracket is being used, refer to the VCR instructions before 

assembling the platform to the arm.

The platform for the PTC13 and the PTC20 has three hole positions to produce 
different degrees of angle (refer to Fig. A for the desired angle position). Using a 
platform bolt (A), an indexing washer (B) and a flange nut (H) attach the platform (E) 
to the circular end of the steel frame arm (G), as shown. Tighten the flange nut (H) to 
desired swivel resistance. CAREFUL! Do not over tighten nut, or the platform (E) 
will not rotate. When the platform is secure, insert  dome cap (I) to the bottom portion 
of the circular end of the steel frame arm (G).

Locate the desired mounting position. Recommended minimum distance from the 
nearest wall is 20 inches for the PTC20 and 16” for the PTC13. Suggestions: avoid 
foot traffic areas and consider proximity of power and antenna connections.

Δ

 Hardware supplied for wood joist construction only! Hardware NOT intended 

for metal joist installation, please call us direct at 800-582-9595 for further 
instructions.

Δ

 This mount is only designed for use on flat ceilings, it will not work on angled or 

vaulted ceilings!

Some joist 
spacing may 
be 24” rather 
than 16”.

Fig. A

C

J

A

B

D

E

A

B

B

I

H

Step 6

Step 5

Step 4

Step 1

Step 2

Step 3

Stud 

Sensor

C

G

B

H

I

PTC13, PTC20

Отзывы: