![Primes BeamMonitor BM+ Series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/primes/beammonitor-bm-series/beammonitor-bm-series_operating-manual_1601730014.webp)
BeamMonitor BM+
35,0(6
14
Revision 02/2019 EN
7.2
Preparation
Check the space available before mounting the device, especially the required space for the connection cables.
The device must be firmly assembled and must be mounted with screws (see chapter 7.5 on page 15).
DANGER
Fire and explosion hazards due to scattered or directed laser radiation
When the BeamMonitor BM+ is being operated, the irradiation must be fully absorbed be-
hind the measurement zone. Fire bricks or other partly-absorbing surfaces are not suitable.
X
Use an adequate absorber. Dependent on the application, PRIMES offers suitable absorbers,
such as the PowerMonitor PM 48/100.
X
Don’t store any flammable materials or highly flammable substances at the measuring loca-
tion.
7.3
Installation position
The BeamMonitor BM+ can also be mounted horizontally or vertically.
Beam incidence
Mounting surface
BeamMonitor BM+
Beam incidence
Mounting surface
BeamMonitor BM+
Beam incidence
Mounting surface
BeamMonitor BM+
Beam incidence
Mounting surface
BeamMonitor BM+
Horizontal installation
Vertical installation
Fig. 7.2:
Installation positions of the BeamMonitor BM+