background image

Prime Design Limited Warranty. Seller’s sole and exclusive warranty (and Buyer’s sole and exclusive remedy and Seller’s entire liability for any breach thereof) with respect to the Goods is set forth in the Limited Warranty document available at primedesign.net/warranty-liability 
(the “Prime Design Limited Warranty”). 

 TM & © 2020 PRIME DESIGN. PROTECTED BY ONE OR MORE OF THE FOLLOWING PATENT NO.’s 6427889, 6764268, 6971563, 8991889, 9415726, 9506292, 9481313, 9776476, 9796340, 10470565, 10486608 AND OTHER PATENTS PENDING

4

PLR-8229 ASSEMBL

INSTR

UCTIONS

USAM-PLR8229-US01 Rev-B 0619

3

Install Clamp base with the included M8 Hardware 

into the DeployPro’s pre-installed Strip Nuts as shown.

Determine desired positioning on the DeployPro, 

and torque to 90 in-lbs. 

4

Position your ladder 

back onto the Deploy Pro. 

Install the Z-Posts onto the 

ends of the Clamp base

as shown below.

6

Using the release levers, 

slide the Clamp base 

together into the closed 

position on the ladder.

6.1

Slide Z-Posts in until they are approximately ¼” from  

the sides of the ladder, and torque the Z-Post Clamp

Nuts to 90 in-lbs.

¼” from ladder sides

NOTE: Ladder Straps will no longer be necessary, 

and may be discarded.

5

Finger-tighten Clamp Nuts only. 

Do not trorque until Step 6.1

Отзывы: