
15
Presto Lifts
PDL Manual
9.
Clear the hydraulic lines by flushing with compressed air.
Hydraulic lines must be clear of debris before connecting or damage
may occur when the unit is powered.
If hoses & electrical wiring are not routed through conduit, hoses and
wiring must be protected from damage by other means.
10. Make all hydraulic connections according the hydraulic schematic.
– See section
Hydraulic Information for specifications and schematics.
11. Make all electrical connections according the wiring schematic.
– See section
Information for specifications and schematics.
Typical required connections during installation shown here.
12. If applicable, install and anchor ramp.
13. Install handrails and snap
cables/ chains.
14. Check all hydraulic hoses
and connections, wiring and
electrical connections, and
other components for proper
installation and damage.
24/1/60 CONTROL SIGNAL &
GROUND FROM CONTROL PANEL
TERMINALS TO JUNCTION BOX IN
BASE FRAME. FOR LIMIT SWITCHES
AND/OR OTHER DEVICES MOUNTED
ON LIFT (IF APPLICABLE).
208/230/460 & GROUND
FROM SUPPLY TO
CONTROL PANEL
24/1/60 CONTROL
SIGNAL & GROUND
FROM CONTROL
PANEL TERMINALS TO
CONTROLS
BEFORE PERSONNEL MAY
RIDE ON LIFT
MUST BE SECURED
ALL SNAP CHAINS/CABLES
THROW OVER PLATE
MUST BE IN RAISED
POSITION BEFORE
RAISING OR LOWERING
THE PLATFORM
ALL HANDRAILS MUST BE
INSTALLED AND SECURED
BEFORE PERSONNEL MAY
RIDE ON LIFT