28/108
MANUAL BILGE PUMP
BILGE PUMP SYSTEM
PROCEDURE TO BE FOLLOWED
- Switch on power to the electric bilge pumps.
- If necessary activate the manual pump.
- Identify the source of the leak by tasting the water and decide on the relevant action to be
taken:
• freshwater = watertank leak.
• seawater = breach of hull.
Location
Operation
Capacity: 31,5 litre / minute
Содержание 400
Страница 1: ...PRESTIGE 400 OWNER S MANUAL S PORTS ET LOISIRS 128490 Index D ...
Страница 2: ......
Страница 4: ......
Страница 7: ...3 108 HISTORY OF UPDATES Index A 07 2010 Index B 09 2010 Index C 03 2011 Index D 11 2012 ...
Страница 8: ......
Страница 10: ......
Страница 11: ...7 108 SPECIFICATIONS AND WARRANTY TECHNICAL SPECIFICATIONS CERTIFICATION DESIGN CATEGORY YOUR BOAT 1 ...
Страница 16: ......
Страница 21: ...17 108 POSITION OF GAS BOTTLE 2 SAFETY ...
Страница 35: ...31 108 HULL MAINTENANCE OF THE HULL LIFTING 3 ...
Страница 38: ......
Страница 47: ...43 108 STEERING SYSTEM STEERING GEAR 5 ...
Страница 49: ...45 108 INTERIOR INTRODUCTION INTERIOR MAINTENANCE MAINTENANCE OF FABRICS 6 ...
Страница 50: ...46 108 INTRODUCTION Saloon Cabins ...
Страница 54: ......
Страница 55: ...51 108 WATER AND SEWAGE WATER WATER TANKS WATER SYSTEM DISTRIBUTION WASTE WATER DRAINAGE SYSTEM SEWAGE WC 7 ...
Страница 68: ......
Страница 70: ......
Страница 91: ...87 108 ENGINE GENERAL INFORMATION ENGINE INSTALLATION 9 ...
Страница 98: ...94 108 Engine control lever Inside wheelhouse Wheelhouse Flying bridge ...
Страница 102: ...98 108 Anode General ...
Страница 103: ...99 108 LAUNCHING LAUNCHING RECOMMENDATIONS 10 ...
Страница 104: ...100 108 POSITION OF HOISTING CRADLE AND STRAPS Note Measurements are expressed in mm 3940 4445 ...
Страница 107: ...103 108 WINTER STORAGE LAYING UP PROTECTION AND MAINTENANCE 11 ...
Страница 110: ......
Страница 112: ......