ALIGNMENT PROCEDURE
(TRUMAN)
* VCO/PLL PORTION
- Alignment procedure
- Test points
- Frequencies chart
* TRANSMITTER
- Alignment procedure
- Test points
* RECEIVER
- Alignment procedure
- Test points
Test equipement required
Frequency
counter
200
Mhz
HF
Generator
DC Volmeter
BF Volmeter
Distortiometer
HF Volmeter
Wattmeter
-
Dummy
load
Osilloscope
FM linear detector
Load 8
Ω
AF generator Sinad meter
Conditions of Measurements on HF Generator
Reception
AM mode: Level - 107 dBm Frequency 1 KHz with 60% of modulation.
FM mode: Level - 107 dBm Frequency 1 KHz with 1,2KHz of deviation.
Transmission
Frequency1 KHz 30mV.
Содержание TRUMAN
Страница 1: ...TRUMAN SERVICE MANUAL ...
Страница 6: ...TP200 TP103 ALIGNMENT VCO PLL ...
Страница 13: ...ALIGNMENT TRANSMITTER ...
Страница 15: ...ALIGNMENT RECEIVER ...
Страница 16: ...TRUMAN BLOC DIAGRAM ...
Страница 17: ......
Страница 18: ...TRUMAN SCHEMATIC DIAGRAM ...
Страница 19: ...ASC OUT 8V ASC IN ASC ...
Страница 20: ...TRUMAN COMPONENT LAYOUT ...
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ...TRUMAN COMPONENTS LIST ...