Page 3 of 12
Insert cams in the unlocked
position, with the opening
facing toward the hole for the
twister dowel.
Insérez les cames dans
la position déverrouillée,
l’ouverture faisant face au
trou du goujon à visser.
1
Zinc Cam (16)
Came en zinc
RM-0103
Blue Rapid Rod (16)
Tige rapide bleu
RM-0583
Metal Dowel Pins (2)
Goujons de bois
RM-0014
14mm Cap (2)
Capuchon
RM-0929-E
espresso
RM-0929-W
white
Plastic Dowel (4)
Goujon en plastique
RM-0072
2” Confirmat Screw (4)
Vis Confirmat
RM-0001
¾” Nail (24)
Clou ¾”
RM-0022
Hardware /
Quincaillerie
Mounting Base (2)
Base de support
RM-0458
#6 - ¾ Pan Head Screw (1)
Vis #6-¾ po.
RM-0460
Cable Tie (1)
Serre-câble
RM-0459
HP-0608
x8
x4
C3
C5
HP-1027-E / HP-1027-W
Содержание USM-0003-1
Страница 5: ...Page of 12 4 5 C6 C3 C5 C6 Finished Edge Côté fini ...
Страница 6: ...Page of 12 6 x4 C4 C4 ...
Страница 7: ...Page of 12 7 x4 Finished Edge Côté fini Finished Edge Côté fini ...
Страница 8: ...Page of 12 8 9 x8 x4 C2 C1 ...
Страница 9: ...Page of 12 10 11 C2 C1 C1 FRONT DEVANT ...