Page 5 of 16
STEP 3
Insert cams into holes on the top of the left
and right gables and left and right sides
Estimated Time: 5 minutes
3a
3b
Insert green twister dowels into remaining
holes on the left and right sides
Right Side
Left Side
Left
Gable
Right
Gable