
Page 13 of 20
Unfold the wooden slats and spread them out
across the inner stabilizers
The nylon strip should be on the bottom
Slide
STEP 11
Estimated Time: 5 minutes
11a
11b
Slide the slats into the metal U-channel
(B7) on the outer gable
On each end of the u-channel there is
a metal divider. One slat on each side
should be positioned between this
divider and the end of the U-channel
11b