Page 7 of 20
B3
STEP 5
Estimated Time: 5 minutes
Insert JRN nuts into the holes on each end
of the upper (B3) and lower (B4) stabilizers.
B4
Identifying the upper and
lower stabilizers
Upper Stabilizers
Lower Stabilizers
Lower Stabilizers
Side hole is close to
the finished edge
Upper Stabilizers
Side hole is
close to the
UNFINISHED
edge
Top edge
(FINISHED) is
rounded