Attach metal U-channels to each outer gable using drawer slide screws
Attach T spacers to outer gables with drawer slide screws.
STEP 2
Estimated Time: 15 minutes
STEP 1
Estimated Time: 10 minutes
Page 4 of 20
Drawer Slide
Screw
Drawer Slide
Screw
TOP
Large
hole
BOTTOM
TOP
Note: In the center of the U-channels there are two pairs of
holes. Each pair has a small and large hole. Make sure the
LARGE HOLE is positioned to the top of the outer gable.
TOP
BOTTOM