![Premio DSS224J-S3 Скачать руководство пользователя страница 1](http://html1.mh-extra.com/html/premio/dss224j-s3/dss224j-s3_quick-manual_1596722001.webp)
Installation and service of this product should be conducted by a trained
personnel to avoid bodily injury from electric shock or heavy object
Observe ESD (Electrostatic Discharge) practices during integration to avoid
possible damage to the board and / or other components
DSS224J-S3 Quick Guide
Version 1.10
–
2017.05.24
1.
Check the Content
of the box. Please confirm that
your package contains the following:
# Description
Image / Description
Qty
1
DSS224J-S3
Enclosure
1
2
Bezel
Opt.
3
Fix mount rail set
1 set
4
Slide Rail Kit + Screws
Opt.
5
Power Cable*
2
6
Serial Cable*
1
7
This Quick Guide
1
8
Packaging
1 set
* Inside the accessories box. Box may consist of screw sets for rail kit or
drives. If any items are missing, please contact your reseller or sales rep.
2.
Get Familiar with the Unit.
DSS224J-
S3 features 24x 2.5” SAS hot
-swap HDD bays with
SAS/SATA interposer support, dual 12Gbps SAS expanders,
550W 1+1 redundant power supply unit, 80Plus Platinum
efficiency, 4x 80mm easy swap PWM fan modules.
Management choice of RS232 mini jack for CLI or Gigabit
Ethernet management port for telnet, SSH, Web GUI, SNMP.
Front view of the unit
24x Drive Bay
Drive Status LED:
(Solid) Drive Error
(Solid) Drive Online
(Blink) Drive Access
Power Button / LED:
System Status LED:
System Healthy
System On
System Off
ID Button / LED:
ID On
ID Off
System Degraded
(Blink)
Alarm Mute Button
Front Panel
Handle
Handle
Rear view of the unit
PSU 2
PSU Status LED:
Power on
Power loss
PSU 1
Primary Expander Module
(with Network Management)
Secondary Expander Module
Fan 1 (back)
Fan 3 (front)
Fan 2 (back)
Fan 4 (front)
Expander Module
3.
Install 2.5” Drives
to the enclosure as illustrated. It is
suggested to install HDDs after the unit is mounted to the
rack.
4.
Mounting the Unit using Fix Mount Rail
When using the default fix mount rail provided with the unit,
remove the rail from the unit before following the instruction
below:
4a.
Prepare the Post
by installing square nuts.
Front
1U
2U
Rear
1U
2U
4b.
Mount the Unit
to the rack.
1. Install the fix mount rail to the rear posts
2. Slide the unit to meet the fix mount rail
3. Secure the unit and fix mount
rail to the posts
1
2
3
1
2
3
5.
Mounting the Unit using Tool-less Rail
If an optional slide rail kit is used, follow carefully the
instruction below on how to use it to mount the unit to the
rack.
5a.
Remove Fix Mount Rail Covers
from the
system.
Thank you for your purchase of Premio DSS224J-S3 JBOD Storage System!