Concrete Specification 

The  specification for the concrete mix to surround the tank should be selected 
by  the  tank  installer  considering  the  site  conditions  and  application 
requirements. 
For  a  typical non-structural application in good  ground  conditions, with non-
aggressive  soils, a  concrete  with  a  28-day  compressive  strength  of  20  to 
30N/mm2 with a  25  to 50mm  slump, complying with the relevant  BS EN, is 
generally suitable. For non-typical applications, aggressive soils or structural 
applications specialist advice should be obtained. 
 

Lift height (rate of rise) 

Determine the lift height (m), or rate of rise (m/h) for  the specific concrete type 
used, to ensure that a design pressure (P max) of 15kN/m2 on the tank 

IS NOT

 

exceeded. 
 

Vibration 

The  design  of  the  tank  assumes  minimal  compaction  of  the  surrounding 
concrete. Where  necessary, this may  be  extended to  include  light  internal 
vibration.  Do  not  use  deep  re-vibration  which will  substantially increase the 
pressure on the tank, possibly causing failure. 
 

Impact of Concrete on Discharge 

The effects of concrete discharge impact are considerable. These effects must 
be considered to ensure the maximum pressure of 15kN/m2 on the tank is not 
exceeded. 

UNDER  NO  CIRCUMSTANCES

  should  concrete be  discharged 

directly onto the tank. 
 

Live Load 

If  the tank is installed in an area where traffic, or other superimposed loadings 
can be applied, a structural engineer should be consulted, to design a reinforced 
concrete  slab  spanning  over  the  tank.  This  is  to  prevent  the  load  being 
transmitted to the tank  (or  its concrete surround).  If  this slab  is constructed 
immediately  above  the  tank,  it  should  be  separated  from  the  concrete 
surrounding the tank by compressible material. 
 
 

Содержание ASP06P

Страница 1: ...20BOD 30SS 20NH3 N Premier Tech Aqua Ltd 2 Whitehouse Way South West Industrial Estate Peterlee County Durham SR8 2RA Tel 44 0 8702 640004 Fax 44 0 8702 640005 Email ptauk sales premiertech com Web ww...

Страница 2: ...OM0006 Conder ASP HDPE Rev 5 2 2...

Страница 3: ...OM0006 Conder ASP HDPE Rev 5 2 3 Table of Contents 2 5 7 7 8 9 10 12 14 15 16 18 20 21 35 36 36 37...

Страница 4: ...OM0006 Conder ASP HDPE Rev 5 2 4 38 39 40 43 44 51 53 60 61 62 63 64 66...

Страница 5: ...OM0006 Conder ASP HDPE Rev 5 2 5...

Страница 6: ...OM0006 Conder ASP HDPE Rev 5 2 6...

Страница 7: ...OM0006 Conder ASP HDPE Rev 5 2 7...

Страница 8: ...OM0006 Conder ASP HDPE Rev 5 2 8...

Страница 9: ...OM0006 Conder ASP HDPE Rev 5 2 9...

Страница 10: ...OM0006 Conder ASP HDPE Rev 5 2 10...

Страница 11: ...OM0006 Conder ASP HDPE Rev 5 2 11...

Страница 12: ...OM0006 Conder ASP HDPE Rev 5 2 12...

Страница 13: ...OM0006 Conder ASP HDPE Rev 5 2 13...

Страница 14: ...OM0006 Conder ASP HDPE Rev 5 2 14...

Страница 15: ...OM0006 Conder ASP HDPE Rev 5 2 15...

Страница 16: ...OM0006 Conder ASP HDPE Rev 5 2 16...

Страница 17: ...OM0006 Conder ASP HDPE Rev 5 2 17...

Страница 18: ...OM0006 Conder ASP HDPE Rev 5 2 18...

Страница 19: ...OM0006 Conder ASP HDPE Rev 5 2 19...

Страница 20: ...OM0006 Conder ASP HDPE Rev 5 2 20...

Страница 21: ...OM0006 Conder ASP HDPE Rev 5 2 21...

Страница 22: ...OM0006 Conder ASP HDPE Rev 5 2 22...

Страница 23: ...OM0006 Conder ASP HDPE Rev 5 2 23...

Страница 24: ...OM0006 Conder ASP HDPE Rev 5 2 24...

Страница 25: ...OM0006 Conder ASP HDPE Rev 5 2 25 7 Integrated blow er ventilation Air inlets...

Страница 26: ...OM0006 Conder ASP HDPE Rev 5 2 26...

Страница 27: ...27 13 HOSETAI L AIR HOSE HOLE IN HOUSING FOR AIR HOSE AIR INLET AIR INLET AIR OUTLET CUT HOLE FOR DUCT AND SEAL AFTER DUCT MIN 50mm GROUND LEVEL BLOWER FIX WITH JUBILEE CLIP ONTO BRASS FITTING GROUND...

Страница 28: ...OM0006 Conder ASP HDPE Rev 5 2 28...

Страница 29: ...OM0006 Conder ASP HDPE Rev 5 2 29...

Страница 30: ...and 2 on Main lid Blower box Diameter to suit cable glandaccordingly STEP 3 Fit Cable Gland for supply 1 and 2 on Mainlidand blower box showing in the picture above making sure thisisfully sealed Allo...

Страница 31: ...OM0006 Conder ASP HDPE Rev 5 2 31...

Страница 32: ...OM0006 Conder ASP HDPE Rev 5 2 32...

Страница 33: ...ected household s Check the electrical supply has been installed by a qualified electrician Sw itch the Blow er Isolator to ON Check the air blow er runs Check the aeration pattern in the bio zone Whe...

Страница 34: ...OM0006 Conder ASP HDPE Rev 5 2 34...

Страница 35: ...OM0006 Conder ASP HDPE Rev 5 2 35...

Страница 36: ...OM0006 Conder ASP HDPE Rev 5 2 36...

Страница 37: ...0006 Conder ASP HDPE Rev 5 2 37 Obtain a sample of the final effluent to check that the plant is operating correctly Thismay require introducing a small flow into the treatment unit to obtain the samp...

Страница 38: ...OM0006 Conder ASP HDPE Rev 5 2 38...

Страница 39: ...ns See page 12 for dimensions Drain Inlet Invert m See page 12 for dimensions Depth from Inlet Invert m See page 12 for dimensions Pipework Connections 110 Socket inlet 110 rubber grommet outlet Appro...

Страница 40: ...OM0006 Conder ASP HDPE Rev 5 2 40...

Страница 41: ...OM0006 Conder ASP HDPE Rev 5 2 41...

Страница 42: ...OM0006 Conder ASP HDPE Rev 5 2 42...

Страница 43: ...onder ASP HDPE Rev 5 2 43 STEP 1 Cut hose approximately 100mm from blower STEP 2 Place Jubilee clips over hose STEP 3 Place T piece in the middle of the hose pipe STEP 4 Tighten all Jubilee clips up s...

Страница 44: ...OM0006 Conder ASP HDPE Rev 5 2 44 PLEASE NOTE Round Float will NOT be fitted to top 2 pump Vertical Switch will be fitted See Page 10 11 for details...

Страница 45: ...OM0006 Conder ASP HDPE Rev 5 2 45...

Страница 46: ...OM0006 Conder ASP HDPE Rev 5 2 46...

Страница 47: ...OM0006 Conder ASP HDPE Rev 5 2 47...

Страница 48: ...OM0006 Conder ASP HDPE Rev 5 2 48...

Страница 49: ...OM0006 Conder ASP HDPE Rev 5 2 49...

Страница 50: ...OM0006 Conder ASP HDPE Rev 5 2 50...

Страница 51: ...olator Power Failure Switch on Checkthe supply board for a trip or fuse Air bloweris running but no turbulence Air pipe hasbeen blocked or squashed or hasa problemsuch as the hose is split Air blower...

Страница 52: ...plant or if a de sludge is required Checkair blower and air lines Grease particles in the bio zone Too much grease in effluent Excessive laundry use Reduce grease in kitchen waste See laundry section...

Страница 53: ...OM0006 Conder ASP HDPE Rev 5 2 53 n...

Страница 54: ...OM0006 Conder ASP HDPE Rev 5 2 54 Do...

Страница 55: ...OM0006 Conder ASP HDPE Rev 5 2 55 Don t...

Страница 56: ...OM0006 Conder ASP HDPE Rev 5 2 56...

Страница 57: ...OM0006 Conder ASP HDPE Rev 5 2 57...

Страница 58: ...OM0006 Conder ASP HDPE Rev 5 2 58...

Страница 59: ...OM0006 Conder ASP HDPE Rev 5 2 59...

Страница 60: ...is fully sealed to prevent backfill entering the system Blower container To be fitted to the extension Ground level must not exceed this level Extension Shaft To be adjusted to suit ground level Secur...

Страница 61: ...l After cutting the shaft please refer to APPENDIX G for installation guide PLEASE NOTE Upon installation of the extension shaft please ensure extension shaft is fully sealed toprevent backfill enteri...

Страница 62: ...unit to the electrical equipment see Electrical Installation p 16 Don t Install any Conder ASP units deeper than the supplied access turrets i e do not extend the turrets Incorporate a standard house...

Страница 63: ...Rev 5 2 63 Please remove transport packaging Foam Plastic Bag before operating this plant When the plant arrives it is fitted with a rubber plug This Must be removed before operating Rubber Plug is re...

Страница 64: ...han 3 mm and not greater than 12 mm Aggregate MUST be clean and free flowing free from large rocks dirt sand roots organic materials or debris Material MUST be washed or screened to remove fine partic...

Страница 65: ...ndary Backfill materials Gravel The Gravel MUST not contain any rocks larger than 36 mm on largest dimension Backfill materialsMUST becleanandfreeflowing free from dirt clay finesand roots organic mat...

Страница 66: ...n The design of the tank assumes minimal compaction of the surrounding concrete Where necessary this may be extended to include light internal vibration Do not use deep re vibration which will substan...

Страница 67: ...excavation until the final pour of concrete has set Failure to do this may result in voids beneath the tank Fill the tank with clean water to a depth of 300mm and recheck the pipework levels and conne...

Страница 68: ...OM0006 Conder ASP HDPE Rev 5 2 68 Maintenance records Plant Commissioning Date Commissioning Company Notes 1st Plant Service Date Co 2nd Plant Service...

Страница 69: ...OM0006 Conder ASP HDPE Rev 5 2 69 Date Servicing Company Notes 3rd Plant Service Date Servicing Company Notes 4th Plant Service Date Servicing Company Notes 5th Plant Service...

Страница 70: ...OM0006 Conder ASP HDPE Rev 5 2 70 Date Servicing Company Notes 6th Plant Service Date Servicing Company Notes 7th Plant Service Date Servicing Company Notes 8th Plant Service...

Страница 71: ...OM0006 Conder ASP HDPE Rev 5 2 71 Date Servicing Company Notes 9th Plant Service Date Servicing Company Notes 10th Plant Service Date Servicing Company Notes...

Страница 72: ...Address _____________________________________________________________________________ Postcode _____________________________________________________________________________ Telephone Number __________...

Страница 73: ...Co Du rh a m SR8 2 RA Premier Tech Aqua Ltd 2 Whitehouse Way South West Industrial Estate Peterlee Co Durham SR8 2RA STEP 2 Fit Warranty Activation Form inside Envelope see reverse for details STEP 1...

Отзывы: