![Premier Mounts PFC-OMND Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/premier-mounts/pfc-omnd/pfc-omnd_installation-manual_1596373007.webp)
Installation Guide
PFC-OMND
www.premiermounts.com | North America 800.368.9700 | Interna1-714-632-7100
3
Page 7
1. Remove the handles (if attached on the OMN-D) before proceeding.
2. Carefully transport the flat-panel display to the mount and fasten using
M8 x 35mm Button Hex screws where applicable. A minimum of 4
mounting points (2 per side) must be use to safety secure the display.
INSTALLING THE OMN-D TO THE MOUNT
2 Person
Recommended
Manually operated
material lift
(Recommended)
Floor Installation
Ceiling Installation
M5 X 35
Button Hex
Shown using OMN55-D for visual clarity. Mounting location will vary based on the viewing height.
minimum of 2
mounting points
per side
minimum of 2
mounting points
per side