![Premier Mounts GB-AVSTOR4 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/premier-mounts/gb-avstor4/gb-avstor4_installation-manual_1596338005.webp)
www.mounts.com | North America 800.368.9700 | Interna1-714-632-7100
Figure 2
Detach the knockout
cover after removing
its screws.
Figure 1
Installation of the power must be done by an
electrician
Remove screws from around the desired electrical
Knockouts (Figure 1) to detach their covers.
Remove the knockout covers from the top of the
GB-AVSTOR4 (Figure 2).
Remove the knockouts.
If you have opened a knockout and no longer want
to use it, re-attach its cover to prevent airflow into
the ceiling.
Removing the Electrical Knockouts (Optional)
1. Determine the desired placement of the
GB-AVSTOR4.
2. Cut and remove half of the ceiling tile where the
ceiling box will be mounted.
Store the half-ceiling tile in a safe location in the
event that it needs to be reused.
Ceiling Box Installation
Ceiling Tile
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
GB-AVSTOR4