
Page 14
Single unit configuration, 3 Wide by 3 High Video Wall, shown for clarity.
ABSEN ACCLAIM A27 LED DISPLAY INSTALLATION MANUAL
must be read in conjunction
with the recommended steps below. LED Cabinets to be handled by industry qualified professional.
Improper installation may cause damage to the LEDs.
1. Mount the LED Cabinets via keyhole mounting starting from
bottom left row, then the upper rows, and the remaining right
column of the video wall array.
2. Latch the cabinets through installation until all cabinets are
fully seated and finetuned.
3. Proceed after all cabinets are seated and adjusted. Install a few
screws on the right-most side of the vertical rail brackets to
lock the cabinets firmly in place.
A
NT
I-S
TAT
I
C G
L
OV
E
S
Use
M5 x 25mm pan head screws
on the right
side of the vertical rail brackets after all LED
cabinets are fully seated.
Example: 3X3 Array
3
2
1
Keyhole
slot
Mounting bolt and cabinets
(supplied by others)
M5 x 25mm
screw
Installation Guide
- ABSEN A27
www.premiermounts.com | North America 800.368.9700 | Interna1-714-632-7100
14