
www.mounts.com | North America 800.368.9700 | Interna1-714-632-7100
Installation Guide
Installationsanleitung, Guía de Instalacíon, Guida de Installazione, Guide d’Installation, Installatie gids
AST-2446-2
1
2
n
n
Use a stud finder to locate a ceiling stud closest
to your desired installation location.
n
o
Identify the center of the ceiling stud.
n
p
Use a pencil to mark the location of the ceiling
stud center.
Minimum of 2 X 4 wood stud to be used
Minimum de 2 X 4 bois goujon pour être utilisé
Stud
Center
WOOD STUD INSTALLATION
n
n
Use a pencil and mark 2 mounting hole locations
through the slots.
Page 4