
Page 55
OPTION 24 VOLT POWER SUPPLY
INSTALLATION
• Make sure the installation complies with local regulations and electrical codes.
• Connect AC voltage to the terminals marked “L” and “N”.
• A red LED is illuminated when the power supply is “ON”.
• The DC voltage is available on the terminals marked “+” and “-”. The second set of
Terminals are used when powering two transmitters from a single power supply (See notes).
Notes: The power supply should be used to power two transmitters only when a single load
cell is connected to each transmitter. For multiple load cell applications it is recommended
that an individual power supply be used for each transmitter. This enables the power supply
to compensate for any fluctuations in the incoming line voltage. Recent field experiences
have shown that voltage drops of greater than 10% can cause the transmitters to drift and
become unstable.
L
N
+ -
230 VAC
24 VDC
Fuse
LED
FUSE REPLACEMENT
The following procedures require work inside the power supply enclosure and should be
performed by qualified service personnel.
• Before opening the unit, disconnect the AC voltage.
• Remove the front cover from the power supply.
• Press down gently on the cover of the fuse holder, and turn counter-clockwise.
• Pull out the cover and fuse as an assembly, replace fuse with a new one.
• Re-install fuse and cover as an assembly, press down gently and turn clockwise.
• Replace the front cover on the power supply.
• Re-apply AC voltage to the unit.
In the event of a malfunction, please contact the nearest distributor for assistance.
Any attempt to modify or repair the power supply will void the manufacturers warranty.
Содержание DAT 400
Страница 2: ...Page II...
Страница 58: ...Page 56 NOTES...
Страница 59: ...Page 57 NOTES...
Страница 60: ......