background image

3

INSTALLATION LOCATION

The location where the barrier will be installed must be previously analyzed, 

including  the  entire  site  infrastructure,  floor  conditions,  electrical  power 

supply, passageway width, ceiling height (if any), vehicle flow and the need 

to use optional accessories.

Once  it  is  analyzed,  the  equipment  that  best  fits  the  needs  of  the  place 

should be chosen.

 

NOTE: 

Using articulated barriers is usually recommended in places with 

low ceilings. In this case, contact the factory to have a barrier with the 

proper size for installation in the specific location supplied.

 

IMPORTANT

Check  if  any  obstacles  could  interfere  with  the  complete  barrier 

opening and closing. If so, the equipment installation will be impaired, 

and  repairs  to  the  local  infrastructure  will  be  necessary.  Carefully 

choose the model according to its technical features and where it will 

be installed. Notice the need for optional accessories. Calculate the 

flow of vehicles on site.

 

NOTE:

 If the floor does not meet the above specifications, a concrete 

base plate respecting the cabinet base dimensions must be provided to 

fix the cabinet. The concrete base plate should be installed at a minimum 

height of 100 mm from the ground.

Preparing the location:

1.  Run a 3/4" conduit pipe through the floor or concrete base plate from 

the center of the base to the circuit breaker box installed from where the 

equipment's electrical supply will come.

2.  Run the power and pushbutton cables through this pipe to where the 

equipment will be operated. Check the table below to choose the cables 

according to the NBR 5410 standard.

TABLE OF CONTENTS

Installation location ............................................................................................................................3

General features ..................................................................................................................................4

Technical specifications .....................................................................................................................5

Equipment dimensions ......................................................................................................................5

Building the base plate to install the cabinet ...............................................................................6

Installing the barrier  ..........................................................................................................................7

Balancing the barrier and checking the belt ..............................................................................12

Adjusting the magnet bar ..............................................................................................................13

Operation ...........................................................................................................................................14

TRIFLEX CONNECT AC control board .........................................................................................14

Encoder system (Digital Reed) ......................................................................................................14

Содержание JETFLEX BRASSO

Страница 1: ...Technical Manual P31491 09 2022 Rev 0 All images in this manual are for illustrative purposes only Manufactured by Motoppar Ind stria e Com rcio de Automatizadores Ltda Av Dr Labieno da Costa Machado...

Страница 2: ...installed Notice the need for optional accessories Calculate the flow of vehicles on site NOTE If the floor does not meet the above specifications a concrete base plate respecting the cabinet base di...

Страница 3: ...et with anti corrosion treatment and electrostatic painting guarantee excellent resistance against the action of time Limit switch system with encoder Electronic brake Allows installing several access...

Страница 4: ...ion door must face the side of the road or vehicle passage INSPECTION DOOR FRONT Curb useful height Sobra 300 mm Useful length Barrier length 280 mm Fixing Deduct from the barrier length 280 mm Barrie...

Страница 5: ...previously marked locations OBS Make 04 holes with a 10mm drill and at least 80 mm deep 4 Insert the anchor bolts in the holes of the base as shown below OBS The anchor bolts must not be inserted thor...

Страница 6: ...ables Use a dedicated circuit breaker that is a circuit breaker where only the barrier will be connected 11 Check setthebarrieralignment openingandclosing Usemechanical stops for this situation and mo...

Страница 7: ...nsioned and ready for operation With your thumb apply even pressure on the belt If it does not bend it is because it is well tensioned If the belt is loose adjust it through the belt tensioner screws...

Страница 8: ...drives the three phase induction motor from a single phase AC power supply and a logic controller to carry out the inverter operations For more information refer to the TRIFLEX CONNECT AC control uni...

Отзывы:

Похожие инструкции для JETFLEX BRASSO