TOOLS REQUIRED FOR INSTALLATION
Here are some tools needed to install the operator:
ELETRICAL INSTALLATION
For electrical installation, the network must contain the following characteristics:
-Electric network 127 V or 220 V;
-Have 5 A circuit breakers in the electrical distribution box;
- 3/4 “diameter conduit between the electrical distribution box and the total
disconnect device;
- 3/4 “diameter conduit between the total turn off device and the operator’s
connection point;
- 1/2 “diameter conduits for external and optional flaps;
- 1/2 “diameter conduit for safety photocells (required).
-The cable for the fixed wiring must comply with NBR NM 247-3;
-The power conductor of a product for internal use must be a 3
x 0.75 mm² flexible cable; 500 V, according to the norm NBR NM
247-5;
-The power conductor of a product for external use must be a 3 x
0.75 mm² flexible cable; 500 V, according to IEC 60245-57.
PLIERS
SAWING BOW
SOCKET WRENCH
SCEW DRIVER
FIXED KEY
LADDER
SOLDING MACHINE
HAMMER
LEVEL
TAPE MEASURE
FRAME
DRILL
PENCIL
SANDER