![PP Systems CIRAS-3 Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/pp-systems/ciras-3/ciras-3_operating-manual_1592668046.webp)
CIRAS-3 Operation Manual V. 1.09
46
There are two major factors influencing battery capacity:
•
Environmental control
•
CFM-3 Chlorophyll Fluorescence Module
For field use, it is extremely important to make sure that the internal battery(s) are fully charged.
We also offer a nice, lightweight external battery pack that can clip easily to your belt for extended
operation time in the field. See
External Battery Pack (For extended operation in the field)
on page 180
for more details.
If you have an older CIRAS-3 system using the old battery pack (Aved type) and are interested in
updating your system to the latest battery technology (Inspired Energy) please get in contact with PP
Systems.
Battery Pack Installation
When systems are first supplied the batteries are packed inside the CIRAS-3 console in “Ship Mode”.
Upon receipt of your new instrument you must remove the packs from each compartment to put them into
“Run Mode” as shown below.
Ship Mode
Run Mode