LPDA-0092-04_PCL Version: R3 1 of 4
Two U Bolt Mounting method:
⚫
Assemble the bracketry on the mast
as shown in the exploded diagram
and tighten nuts finger tight.
⚫
Align the antenna in the direction
of the base station, please bear in
mind the antenna has a beamwidth
of approximately 55 degrees.
⚫
Fasten nuts on U bolts with 10mm
wrench/spanner,but do not overtighten.
⚫
Be sure to provide strain release for the
cable by securing it the mounting
structure near the antenna using a
cable-tie (not provided).
Single U Bolt Mounting method:
⚫
Assemble the bracketry on the mast as
shown in the exploded diagram and
tighten nuts finger tight.
⚫
Align the antenna in the direction of the
base station in both vertical and horizontal
position.Please bear in mind that the
antenna has a beamwidth of approximately
55 degrees in the horizontal plane and 50
degrees in the vertical plane.
⚫
Fasten nuts on U bolts with 10mm
wrench/spanner, but do not over tighten.
⚫
Be sure to provide strain release for the cable
by securing it the mounting structure near the
antenna using a cable-tie (not provided).
LPDA-0092-04_PCL Version: R3 2 of 4
⚫
The single U bolt mounting allows
the antenna to be adjusted in the
vertical plane by approximately 26
degrees up and down from the.
horizontal position.
Operational lnstructions
⚫
Connect an appropriate device or suitable cable extension to the
antenna via the SMA-connector on the end of the cable attached
to the antenna. Seal the connection with Self Amalgamating or
Butal Tape to ensure no water ingress.
⚫
Final antenna alignment can be achieved by monitoring the
signal strength indicator of the communication device to which
the antenna is connected for maximum signal strength.
⚫
The antenna is now ready for use.