6 Section 1 • Installation
1.
If you plan to use our power management software, connect
your computer’s communication cable to the UPS RS-232 port.
2.
Plug your UPS power cord into a wall outlet or other power
source.
If your UPS uses a customer-supplied power cord, it must be
correctly rated (see Appendix B, Specifications). You can also use
the power cord from your largest load if it is correctly rated.
Once the UPS is connected, it conducts a self-test and then goes
to Standby mode. If a red Site Wiring or Battery Service LED
stays on, consult Section 2, Operation, or Section 5,
Troubleshooting.
3.
Plug your loads (computer, monitor, etc.) into the UPS output
receptacles. Use the provided interconnecting line cords where
applicable.
4.
Start the UPS by pressing the ON button as shown in Figure 3.
Power is now available to the rear receptacles, and the ON LED
is lit.
5.
You have now completed installation. To learn how to operate
the UPS, see Section 2, Operation. To change the factory-set
defaults, see Section 3, Configuration.
NOTE
The UPS will charge to 90% in approximately 4 hours. However, it is recommended that you charge for
24 hours after installation or long storage.
Содержание ACE Series
Страница 2: ......
Страница 8: ......
Страница 16: ......
Страница 20: ......
Страница 34: ...26 Appendix A Additional UPS Features Figure 8 REPO Port ...
Страница 40: ...32 Appendix C UPS Rear Panels Figure 13 2000 and 2400 VA 230 V Rear Panel Figure 14 3000 VA 230 V Rear Panel ...
Страница 42: ......
Страница 43: ......
Страница 44: ...05145651A ...