14
GTS Series Uninterruptible Power Manager
Operational Tests
Observe the front panel of the UPM. The following table shows how the
front panel LED should appear upon start-up
NOTE:
Depending on the charge state of the battery, it is possible that the
battery LED may be flashing (this is normal).
With the connected equipment powered off, perform an initial test of the
UPM backup function by pressing the Test/Silence button on the front
panel. During this test, the Battery LED on the front panel should briefly
illuminate. It is also possible to test the backup function by unplugging
the UPM input power cord. If you choose to test the UPM in this manner,
you will note that the UPM will beep every few seconds while the power
cord is unplugged. The Battery LED will also illuminate constantly.
Once you have performed an initial test of the UPM backup function, turn on
the connected computer equipment. Verify that the unit is not overloaded.
If the unit is overloaded all load LED’s will flash, remove the least critical
devices from the UPM one by one until the overload LED’s are extinguished.
With the connected loads powered up, perform the backup test again by
pressing the Test/Silence button or unplugging the UPM. When this final test
is completed, the UPM will be ready to use.
NOTE:
• If you leave your UPM on continuously, it is a good idea to perform
a test at least once a month.
• If you are utilizing MopUPS Express software, you can configure
the system to automatically self-test periodically.
Indicator
Load
Monitor
LED’s
Voltage
Manager
Normal
Battery LED
Over Temperature
LED
Fault LED
Status
Off
On
Flashing
Off
Off
Содержание ABCEG251
Страница 28: ...28 GTS Series Uninterruptible Power Manager Figure 2 250 400 VA Figure 3 600 VA ...
Страница 30: ...30 GTS Series Uninterruptible Power Manager REAR PANEL 400 VA MODELS INTERNATIONAL NORTH AMERICAN ...
Страница 31: ...31 GTS Series Uninterruptible Power Manager REAR PANEL 600 VA MODELS INTERNATIONAL NORTH AMERICAN ...