6
Installation for BP 120V (7Ah/9Ah/10Ah)
Put all batteries inside of battery pack and connect jumper wires from fuse PCB to batteries as
below chart.
IMPORT, DISTRIBUTION & MANUFACTURE
DATA AND MEDIA EE
www.data-media.gr, [email protected]
1st Km Lagadas road to Iraklio, Lagadas, Thessaloniki, 57200