![PowerTec 70299 Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/powertec/70299/70299_instruction-sheet_1591566002.webp)
INSTALLATION
Refer to Figure 2, 3
1. Place the bucket lid upside down and attach the elbow to
one of the holes in the lid. Make sure the elbow is oriented
as shown in Figure 1 and does not face the other hole.
Figure 2
2-1/2"
Elbow
Underside of 12"
two stage cyclone
separator lid
2. Place the lid onto the plastic bucket.
Figure 3
3. Connect the system to a shop vacuum or dust collector.
The shop vacuum or dust collector MUST be connected
to the dust port WITHOUT the elbow. The lid accepts
2-1/2" ID dust collection hoses. Actual ports size,
OD 2-15/32", ID 2-19/64".Components for connecting
the system to a shop vacuum or dust collector are
sold separately.
4. After the system is connected to a shop vacuum or dust
collector, connect the system to the tool being used.
The components needed for these connections are
sold separately.
NOTE: Empty the bucket when it is half full for
maximum performance.
Southern Technologies, LLC
Waukegan, IL 60087