RED00202(R2) MANUAL
Connections and Signal Table
Position
Function
Remarks
V1in
DC(+) voltage input 1
Connect to (+) of the DC-source 1
V2in
DC(+) voltage input 2
Connect to (+) of the DC-source 2
Vout
DC(+) voltage output
Connect to (+) of the load
GND
Common GND
Connect to (-) of the DC sources 1&2 and to the (-) of the connected load
Relay
Change over contact
Left position indicates all DC-inputs are ok and operate between Vu and Vo
Right position indicates that a DC-source fails or that it operates below Vu or
above Vo
V1in LED
LED signal
OFF = no voltage, YELLO = low voltage
V1in LED
LED signal
OFF = no voltage, YELLO = low voltage
ADJ
Potentiometer
Set the drop out voltage together for V1 and V1
Mechanics & Installation Instruction of the RED00202
Stable metal/aluminium housing IP20. To allow adequate convection, a free air space of 50mm (top/bottom)
and 10mm (sidewalls) is required; and for active devices 15mm space from the sidewalls. For proper air
convection it is necessary to install the RED. One can use the DIN-Rail installation (equipped standard) with our
patented 35mm DIN-Rail bracket according to EN60715. It is easy to mount/dismount while snaping it onto the
35mm DIN-Rail - no tools necessary. The housing screws are recommended for the GND-connection – do not
remove them. For operation >60Vdc a GND-connection to PE is necessary to prevent from any kind of
interferences to the supply system.
It is not allowed to install the RED00202 in other mounting direction then below drawings.
natural convection
>20 CFM
Mounting Instruction
Bottom
forced convection:
To
p
De
vic
e
Bo
tto
m
Top
Device
Bottom
Rail
D
e
v
ic
e
www.powersolve.co.uk
020321