background image

Installation Instructions 

NOTE:

 Installation should be in accordance with accepted plumbing  

practices. Flush all pipes thoroughly before installation. Installation and  

field adjustment are the responsibility of the installer. 

Installation 

n

1.    Locate suitable place for the tempering valve. Valves should be accessible 

for service and adjustment, and as close to the point of use as possible.

2.   Bleed pressure from the system.
3.  Route copper tubing or piping to fit valve dimensions.
4.     For valves with Quick-Connect tailpieces refer to “Quick-Connect 

Installation” instructions below.  

5.    Remove tailpieces from the valve and make sure union nuts are over  

the tubing/piping before connecting to the tailpiece.

NOTE:

  If soldering, remove unions and gaskets from valve body prior to  

soldering to prevent damage to valve from excessive heat.

6.   Flush piping again, install valve using filter gasket on  

hot and cold water inlets and fiber gasket on mixed  

water outlet.

7.   Turn on the cold and hot water. If any leaks are observed,  

tighten connections as necessary to stop leak  

before proceeding.

HydroGuard

®

 Thermostatic Tempering Valves

ASSE 1069 and 1070 Series LM495 and LFLM495

IS-P-LM495 

1.  Mark pipe as shown.  

This is pipe insertion depth.

2. Clean pipe end.

1. Remove collet clip.

2. Depress collet.
3. Pull tubing from tailpiece.

3.  If using PEX tubing, insert pipe  

stiffener (provided) into end of pipe.

4.  Push tubing into tailpiece up to mark.
5. Insert collet clip.

  To Connect

  To Disconnect

PEX tubing only

Pipe Stiffener

Tail Piece

Mark

Collet clip

Collet depressed

1

1

2

 in. (38.1mm)

1

3

4

 in. (44.45mm)

1

7

8

 in. (47.63mm)

1

2

 in.Pipe (12.7mm)

3

4

 in.Pipe (19.05mm)

1 in.Pipe (25.4mm)

Figure 1. 

Typical ASSE 1069 Application

Quick-Connect Installation 

n

Cold

Hot

LM495 or 

LFLM495

Mixed

LFLM495-1

LM495-5

COLD WATER

SUPPLY

POWERS SERIES LM495 OR 

LFLM495 WITH INTEGRAL 

CHECKS AND SCREENS

HOT WATER SUPPLY

Figure 2.

Single/Two Handle 

Faucet Application

Advanced  

Thermal Activation

Отзывы: