PowerPlus Energy PowerLink Скачать руководство пользователя страница 8

Verifying configuration 

Wait for 2 minutes after connecting everything, and then via the web page, click on the 
“MultiStat” button. 

Verify that all the batteries are responding.  

If you are unable to see the status of all the batteries, press the “Configuration” button 
and then press the “Restart Polling” button in the configuration page. 

Request login details for the portal 

The portal URL is: https://performance.powerplus-energy.com.au:3000/login 

To gain your login information for the portal, email “[email protected]
and provide the following information: 
• Subject line: Portal access request 
• PowerLink Serial Number 
• Site Name 

Our support team will then create a login and email it to you the details once complete. 

PowerLink Installation  
and Operation Manual

V 3.2

Page   of 

8

8

+61 3 8797 5557
Building 21-25, 885 Mountain Hwy
Bayswater Vic 3153
PO Box 4407, Knox City Vic 3152
[email protected]

Содержание PowerLink

Страница 1: ... Installation and Operation Manual V 3 2 Page of 1 8 PowerLink module 61 3 8797 5557 info powerplus energy com au Building 21 25 885 Mountain Hwy Bayswater Vic 3153 powerplus energy com au Residential Commercial Industrial Utilities and Telecom ...

Страница 2: ...ntents 5 PowerLink module Setup and monitoring procedure 6 PowerLink set up 6 Web interface setup 6 Battery scanning procedure 7 Cabling 7 Verifying con fi guration 8 Request login details for the portal 8 PowerLink Installation and Operation Manual V 3 2 Page of 2 8 ...

Страница 3: ... batteries have been designed as a stand alone self managed solution however the PowerLink module also provides information via MODBUS with future releases including CANBUS and SNMP options The information provided by the PowerLink module will assist in providing the optimum performance and longevity from your energy storage Speci fi cations PowerLink Installation and Operation Manual V 3 2 Page o...

Страница 4: ...n and Operation Manual V 3 2 Page of 4 8 40 mm 90 mm 100 mm RJ45 port internet 5 USB ports not used 7 USB micro power port 2 Alarm port not used 9 Audio port not used 4 HDMI port not used 3 RJ45 port battery monitoring 1 Power LED indicators 8 ...

Страница 5: ...Contents PowerLink Installation and Operation Manual V 3 2 Page of 5 8 PowerLink module 30cm RJ45 cable per battery plus a longer RJ45 cable as required 5V power supply RJ45 termination connector ...

Страница 6: ...nd side of the PowerLink module Web interface setup Open your WiFi network settings and connect to PPE Powerlink xxxx where xxxx is taken from the serial number of the module The password is 12345678 Open your web browser in the address bar enter http 192 168 0 10 8822 Press the Con fi guration button Press the Reset data button Enter the Number of Batteries in this installation and press the Subm...

Страница 7: ...ttery and press the Scan button again continue until all batteries have been scanned Cabling Once all batteries have been scanned the PowerLink module must be connected via the battery monitoring RJ45 port 1 to the upper port on the fi rst battery Using the 30cm RJ45 cables plug a cable from the lower port of the fi rst battery the top most battery to the upper port of the battery below Continue t...

Страница 8: ... for the portal The portal URL is https performance powerplus energy com au 3000 login To gain your login information for the portal email support powerplus energy com au and provide the following information Subject line Portal access request PowerLink Serial Number Site Name Our support team will then create a login and email it to you the details once complete PowerLink Installation and Operati...

Отзывы: