10
First Operation
2
First Operation
2.1
Instruction
Only persons trained by qualified
PowerBoss technicians are authorized
to operate, service and repair the ma-
chine. Operators must read and under-
stand this manual before operating or
maintaining this machine.
2.2
Initial charging procedure
Before first operation of the
machine, fully charge the bat-
tery with an initial charging pro-
cedure and comply with the
operating instructions of the
charger as well as with those of
the battery manufacturer.
PowerBoss cannot be held lia-
ble for damages resulting from
an insufficient initial charge.
2.3
Before Putting into Operation
Complete the following inspections be-
fore taking the machine into operation:
1. Check the area around the machine
for signs of leakage. Hoses, lines
and tanks must be free from any lea-
kage or damage.
2. Install brushes and squeegee, see
maintenance chapter.
3. Install batteries and connect battery
plug, see maintenance chapter.
4. Check battery charge and recharge
if required. An initial charge is requi-
red before first operation of the ma-
chine.
5. Empty recovery tank and clean it if
required, see maintenance chapter.
6. Refill solution tank and add cleaning
agent according to the manufactur-
er's recommendations.
Use only cleaning agents sui-
table for automatic machines
(low-foaming) and comply with
the instructions for use, dispo-
sal and with the warning infor-
mation specified by the cle-
aning agent's manufacturer.
2.4
Start Machine
Proceed with the following to set the
machine to operating mode:
• Disconnect mains plug of the char-
ger from outlet and fasten to holder.
• Switch on machine by actuation of
key switch from position (0) to positi-
on (1).
Содержание Phoenix 24
Страница 1: ...User Manual Phoenix 24...
Страница 39: ...39 Maintenance and Care NOTES...
Страница 40: ...40 Maintenance and Care...
Страница 41: ...41 Maintenance and Care...