PowerHook  Installation  Overview 

For comprehensive installation instructions of the PowerHook  read and  understand the

Installation and  Operation Manual.

Additional installation procedures not given in this overview are  required if the unit is  part of

a CENTRAPOWER system or if the unit has a power pack mounted in a location that is

remote from the unit.

PREPARATION 

Installation Overview For:

1. Some units are shipped with  the control assembly, bumpers,  and outside signal light

assembly attached to the unit.  Remove these items from the unit prior to installing  unit in pit.  DO  +-

---,.-

,

-

,:,

,--

_

-

_

------·--

NOT remove the shipping bands at this time.

2.  Remove all debris from the pit. 

�:·--.... ..... --� 

3.

Check the  pit dimensions with the certified Pit Drawing.  Make sure  that the walls  of the pit

L--��  :"--,,,,,,,__ 

are plumb and square with no bulges.  Make sure the dock height, the location of the plates

'<a:.-=:::::-

.:

::-� 

imbedded  in the pit,  and the location of the junction box  are  as specified on the  Pit Drawing.

---

INSTALLING  UNIT IN  PIT 

4.

Place the shims  for the front and  rear legs on the plates imbedded in the pit floor.  Position

the shims so that the legs will rest firmly on the shims when the unit is lowered into the pit. Shim

so that dimension from top of shims to dock floor is as shown in Figure 1  Recommended shim

stock sizes are given in Figure 2.

Figure 1

Stack Shims 

to Height 

Shown 

Electrical 

Junction Box 

MODEi. KS7 

MOPS..1<$6 

$hown with Single

lwl$t.Cylindor 

Suppon

7-1/2'":x Ml.?.")( 114" 

a,,,. 

1rr•,012.·· 

Figure 2

Typical 

Shims 

PowerHook 

Full  Pit Depth  Stand  Mounted  (KS6) 

PowerHook 

Recessed Front Stand Mounted (K57) 