See appropriate Power Sentry Installation Instructions for applicable warnings and precautions
Power Sentry Field Install
Wiring Diagram & Instructions - PS30250 Four Boards in Series
Field Install Instructions *
1.
Disconnect Battery Enable connector (RED wires with mating connectors)
2.
Disconnect Driver Line input from Mains
3.
Connect Mains Line to Test Switch
4.
Connect Un-switched Line to Test Switch (Line input to Power Sentry must be un-switched)
5.
Connect Test Switch output (Mains Line) to Driver
6.
Connect Test Switch output (Un-switched Line) to Power Sentry (BLACK for 120V, ORANGE for 277V)
7.
Cap unused Power Sentry Un-switched Line input wire
8.
Connect Mains Neutral to Power Sentry WHITE
9.
Connect Power Sentry RED wire to wire nut with Driver LED (+) (in this example RED)
10.
Remove Driver LED (-) wire from wire nut (in this example BLACK)
11.
Connect Power Sentry YEL wires to wire nut with LED Board (-)
(An additional or larger wire nut may be required)
12.
Connect Power Sentry BLU wires to wire nut with Driver LED (-) (in this example BLACK)
(An additional or larger wire nut may be required)
13.
Ensure PURPLE wires are not connected
14.
Connect Battery Enable connector (RED wires with mating connectors)
*SEE LAST PAGE FOR MOUNTING OPTIONS AND PLACEMENT