2.2

 

Wind Speed Feed back 

 
The wind speed feed back is an open collector source.  The generated pulse train has 
frequency identical to the generator frequency.  Max pull up voltage = 24Vdc; zero 
level = 1.4Vmax; max current = 1mA. The pulse train is generated from two of the 
wind turbine input phases (1 and 2).  A hardware filtering optimizes the frequency 
reading in the range 5-200Hz.  
 
 

3   WBI Installation and Commissioning 

 

The Wind Interface Box must be wired in accordance to the National Electric 
Code (NEC) ANSI/NFPA 70, where applicable. 
 

All energy sources need to be de-energized and locked out before starting to 
work on the wind energy system. 

 
CAUTION:   Risk of fire and shock, connect Output (DC) terminals prior to 
the connection of Input (AC) terminals. 

 
Disconnect devices shall be provided in the end use installation on the AC side. 
 

Input source shall have a disconnect device complying with the National 
Electrical Code ANSI/NFPA 70, where applicable. 

 

Input source and output circuit conductors shall be provided with over current 
protection complying with the National Electrical Code ANSI/NFPA 70, 

where  applicable. 
 
US versions: 
The WBI must be installed using watertight wiring methods. This requires the use of 
UL listed watertight components and locknuts with the applicable wiring method: 
refer to Table 2.1 for required system connections. The optional Wind speed and 
Diversion load connections are sealed with hole covers, Cembre, type PG9 (3/8”) 
(model 1052009N) and type PG16 (model 1052016N) or the equivalent UL listed 
watertight hole covers. See figures 3 and 4 for further details. 
 

 
 
 
 
 
 
 
 

Содержание AURORA PVI-2500-WIND-INTERFACE

Страница 1: ...AURORA Wind Box Interface INSTALLATION AND OPERATOR S MANUAL Model numbers PVI 7200 WIND INTERFACE PVI 4000 WIND INTERFACE PVI 2500 WIND INTERFACE Rev 4 0...

Страница 2: ...olo Ferrini 16 Apr 2009 Additional Information SAVE THESE INSTRUCTIONS IMPORTANT SAFETY INSTRUCTIONS PVI 7200 WIND INTERFACE PVI 4000 WIND INTERFACE PVI 2500 WIND INTERFACE available upon request This...

Страница 3: ...e paragraphs highlighted by this symbol contain processes and instructions that must be absolutely understood and followed to avoid potential danger to people NOTE the paragraphs highlighted by this s...

Страница 4: ...ed and trained personnel all national regulations on accidents prevention shall be complied with According to these basic safety rules qualified and trained people have skills for the assembling start...

Страница 5: ...de 10 1 4 5 Grid Fail 10 1 4 6 Wait the wind 10 2 WBI Connections 11 2 1 Required System Connections 11 2 2 Wind Speed Feed back 13 3 WBI Installation and Commissioning 13 3 1 Assembly and Mounting In...

Страница 6: ...his function may extend the use of the product with some kind of high voltage turbine The diversion load activation may occur with high winds severe gusts and when the utility grid fails WARNING This...

Страница 7: ...utput power 360 600Vdc PVI 7200 W I 200 600Vdc PVI 4000 W I Operating ambient temperature 25 C to 55 C 13 F to 140 F Enclosure type Nema 4X Relative Humidity 0 100 condensing Audible Noise 40dBA Size...

Страница 8: ...llation and Operator s Manual Page 8 of 20 Aurora Wind Interface Rev 4 0 1 2 WBI Block Diagram The AURORA WBI is designed to be used with the Aurora Wind Inverter Figure 1 Wind Box Interface Block Dia...

Страница 9: ...tem block diagram The wind turbine must have a primary safety means of limiting the wind turbine speed this typically is a some type of furling method blade stalling self limiting airfoil design elect...

Страница 10: ...he utility interconnection checks and is connected to the utility grid The inverter is exporting power to the utility grid and following the power curve of the wind generator 1 4 4 Export Diversion Mo...

Страница 11: ...for all other non US versions I O Connection Required Knock out Trade Size US Glander others Wind Speed Optional PG 9 3 8 M16 Wind Input Yes PG 16 3 4 M32 Diversion Load Optional PG 16 1 2 M25 Bulk O...

Страница 12: ...Installation and Operator s Manual Page 12 of 20 Aurora Wind Interface Rev 4 0 Figure 4 Glanders designations for standard version non US...

Страница 13: ...k of fire and shock connect Output DC terminals prior to the connection of Input AC terminals Disconnect devices shall be provided in the end use installation on the AC side Input source shall have a...

Страница 14: ...The WBI must be mounted at least 1m 3 feet above floor level on a vertical surface 3 1 2 Minimum clearances The WBI needs to be mounted with the following minimum clearances around itself Top 20 cm 40...

Страница 15: ...the Aurora Wind Inverter Connect the Bulk Out terminal to the IN 1 terminal in the Aurora wind inverter Connect the Bulk Out terminal to the IN 1 terminal in the Aurora wind inverter Verify that the...

Страница 16: ...us LED 3 6 3 Aurora Wind Inverter The Aurora Wind Inverter is a grid connected only inverter A connection to a grid is required for operation The Aurora Wind Inverter will connect to the grid and expo...

Страница 17: ...iversion LED status High wind speeds Diversion load is active No proper power curve is uploaded W s slope is to be optimized Wind turbine stalls Wind Input Vac 40 Vac Diversion LED status Diversion Lo...

Страница 18: ...Installation and Operator s Manual Page 18 of 20 Aurora Wind Interface Rev 4 0...

Страница 19: ...Installation and Operator s Manual Page 19 of 20 Aurora Wind Interface Rev 4 0...

Страница 20: ...Installation and Operator s Manual Page 20 of 20 Aurora Wind Interface Rev 4 0...

Отзывы: