6
Open Shipping Crate
1. Set the shipping Crate on a solid, flat surface.
2. Carefully cut the shipping bands and remove lid of shipping crate.
3. Using two people to lift, carefully remove the engine, oil tank, wheels, tow bar, support legs, and
hardware. (For parts reference see the last page in manual)
4. Locate all hardware before beginning assembly.
Step 1: Outrigger leg Assembly Step 2: Outrigger leg Assembly
ASSEMBLY
assemble the left and right outrigger leg in
proper position.and fix with bolt and lock nut as
per picture.
Upright the beam, and assemble the left and
right outrigger leg in proper position.and fix
with bolt and lock nut as per picture.
Содержание PK0322
Страница 1: ...22 TON 3PT LOGSPLITTER MODELS PK0322 Owner s Manual and Operating Instructions...
Страница 3: ...3 OPERATION INSTRUCTIONS WORK IN HORIZONTAL WORK IN VERTICAL...
Страница 4: ...4 OPERATION INSTRUCTIONS HOW TO SPLIT THE LOG WITH SLANT SURFACE...
Страница 5: ...5 Components in the package...
Страница 9: ...9 EXPLODED VIEW AND PARTS LIST...