background image

 

 

 

Anna Daybed 

 

Pre-assembly: 

• 

Please read all instructions carefully before assembly. 

• 

For your safety and ease, assembly by three people is recommended. 

• 

Save all packing materials until assembly is complete to avoid accidentally discarding small 
parts or hardware. 

 

Parts Included: 

 

BOX 1:

 

• 

(1) Headboard  

 

BOX 2: 

 

• 

(1) Footboard 

 

 

BOX 3: 

 

• 

(1) Front side rail 

• 

(1) Back side rail 

 

 

 

• 

(1) Cross-slat roll 

 

 

(1) Hardware included: 

 

 (28) 8x30mm Phillips wood screws (A) 

 

 

Tools Needed: 

• 

Phillips screwdriver (not provided)  

 

Assembly Instructions: 

1.  One person should hold the headboard in a vertical position tilted slightly forward.  
2.  Attach the front side rail (small) and the back side rail (large) to the headboard by dropping 

the rails’ hooked ends into the corresponding slots in the headboard. Be sure the lips of the 
front side rail and back side rail are facing inward. 

3.  Repeat the process with the footboard. 
 

Mattress Support System Assembly Instructions: 

1.  Place cross-slat roll on side rail lips and roll out so the pre-drilled hole on the end of each slat 

lines up with the pre-drilled holes on the side rail lips. (Binding should be face down). 

2.  Attach the cross-slats in place by inserting the 28 Phillips wood screws and tightening with 

Phillips screwdriver.  

 

3.  Periodically tighten all connections. 

 
 
 

 
 

 
 

 
 

 
 

 
 

 
 

 

 

Care Instructions: 

• 

Dust with a clean, soft cloth. Avoid the use of all abrasive cleaners. 

 

 

thank you for your purchase 

stores   |   catalog  |  www.potterybarn.com

 

Отзывы: